The project commences early November 2012 for the reinforced concrete works and i finishes late December.
The project comprises of reinforced concrete floor slab with an area of 4500m2. Reinforced concrete perimeter retaining walls of approximately 500 meters long. The reinforced concrete silt sump base and walls various plinths and a water tank base.
|